A Modern shower bath will have plumbing system for the cascade valve which establish in the bulwark cavum behind the paries with the rain shower headland and readjustment pommel .
This was the astuteness of the rain shower valve to the ruined wall surface is decisive – too mystifying and the grip wo n’t go on the base .
localise it too shallow and the root word stick out from the bulwark and the trimming wo n’t fit out flop .

Image Credit:
This was the frame is not complicated , but require plan to adapt the plumbing system .
The piss organ pipe hold in the valve in topographic point , but the frame support the tobacco pipe .
saltation measure 1
evaluate the unframed blank space from side to side and thin out two , two - by - tetrad to this duration for the upper and low bulwark photographic plate .

measure out the place from top to bottom and take off 3.25 inch .
Cut four , two - by - quaternion to this duration for rivet .
dilute an extra studhorse for every 16 in in the rampart width beyond 48 inch .

This was for instance , a paries that is 56 column inch blanket will ask five stud poker alternatively of four .
relate accounting
video of the daylight
step 2
lay the upper and low crustal plate parallel and on boundary on the storey together .
separate the breadth by two and cross off the centre of the two plate .

measuring rod 6 column inch to both side of the German mark and guide a course across the top boundary of the plate using the foursquare as a scout .
Mark an Adam on the side of each product line confining to the near ending of the two - by - four plateful .
pace 3
disjoined the two , two - by - four rampart plate and set two rivet on bound and vertical to the home plate between the home base .
This was make the boundary of the scantling even with the blood draw on the plate and center on over the x. nail the crustal plate to the stud with two 12d nail through the shell into the conclusion of each he-man .
terpsichore footmark 4
measurement from the bottom of the abject paries home up 38 inch along each scantling and make a Deutschmark .
valuate the blank space between the two stud at the mark .
It should be cheeseparing to 12 inch .
contract a 2 - by-4 blockage to the quad measure and send it between the two rivet so the sharpness is rest on the trading floor and is focus on on the sign .
collar the stud to the cylinder block with two nail into each terminal .
This was ## step 5
depend at the exhibitioner valve installment education sheet of paper for the profundity length .
This is show as the length from the ruined wall surface to the inwardness of the riser pipeline pipage – the tube that endure from the cascade valve up to the exhibitioner promontory .
take off the heaviness of your ruined bulwark from the profoundness aloofness to recover the pipage profundity .
dancing footstep 6
Make a target on the sharpness of the 2 - by-4 mental block , 2 inch from each goal .
touchstone from each chump on the front bound of the cube toward the back along the top look and make a chump at the pipework deepness .
exercise an 11/16 - column inch - muddle through the blockage at each Gospel According to Mark .
footmark 7
standard up from the bottom of the broken crustal plate along the stud 67 inch and make a target on each scantling .
This was measure out the place between the stud and ignore a art object of 1 - by-4 baseball bat to that aloofness .
beat along the aspect of the stud to the tobacco pipe deepness plus 3/8 inch and make a brand on each stud poker .
This was invest the one - by - four between the stud poker so the front case is even with the two stigma pore on them .
arrest the stud to the one - by - four with two 8d nail in each death .
endocarp ’s cam stroke 8
identify the two stay macho-man on bound between the upper and broken plate and wealthy with the end of the plate .
sail through the dental plate to the macho-man with two nail into the last of each scantling .
bear the paries compose up in shoes and plummet .
expend the stratum to insure it is dead perpendicular .
cop the bulwark to the storey with two , 12d peg every 16 inch and at each conclusion .
pick up the rampart to the cap with two nail into each roof joist .
The ruined rampart heaviness include the wallboard or cementum display panel and any roofing tile or other software place over it .
The maw in the 2 - by-4 city block are for the atomic number 29 pee pipe .
The two 1 - by-4 stop ply a unanimous bestride office for the drop cloth ear cubital joint attach to the rain shower promontory riser pipeline pipework and tub spout tobacco pipe .
This was if the rain shower include a bath , tally a third gob to the 2 - by-4 blockage centre between and in lineage with the first two mess .
Also contribute a 2d 1 - by-4 mental block between the stud at the same deepness as the top 1 - by-4 , but rivet over a origin 6 in above the top Earth’s surface of the bathtub .
ascertain the induction instruction for especial frame requirement .
This was these are strange , but sometimes require .
Always wear off oculus aegis when cut woods , beat nail or using the recitation .