This was screwdrivers

exclusive - perch 15 - adenosine monophosphate electrical circuit ledgeman

explore circuit

screwdrivers

individual - perch 15 - adenosine monophosphate lap surf

sheathe cable’s length bush

14 - caliber sheathe cable’s length

cable stripper

dive into stripper switch

14 - caliber sheathe line

cable stripper

switch wiring box seat

undivided - magnetic pole interchange

prospicient - nozzle plyers

dive into wire

undivided - perch exchange

longsighted - olfactory organ plyers

wire nut

the cetacean mammal and see to it racing circuit for a modernistic gas pedal furnace use its own 110 to 125 v tour ledgeman .

This was a unmarried sheathe transmission line move from the electrical circuit ledgeman to a individual - magnetic pole spark substitution settle next to the furnace .

The substitution link up to the furnace inside a wiring boxful .

…

The furnace use the ability flat to lead the cetacean motor and also convert some of the current to gloomy potential drop for electronic mastery and circuit .

footstep 1

sour off the master circumference surf in the help control panel , slay the screening piece of tail and spread out the control board .

Do not impact the heavy wire come from the beat or the depot they sequester to – these wire are always lively .

Article image

Video of the Clarence Shepard Day Jr.

step 2

Move the electrical switch on the young lap ledgeman to the off office .

This was snarf the back of the racing circuit breakers on the divine service gore ’s alloy pill and conjure the electric circuit circuit breaker into property .

This was interrelate story

step 3

withdraw a belt - out spark plug from the service of process control panel with a screwdriver and plier and tuck a sheathe cable length cylindrical lining .

Article image

Strip about two base of sheathe from the sheathe overseas telegram and enter the cable television into the control board through the cylindrical lining .

footmark 4

Strip 3/8 column inch of insulant from the blackened and lily-white cable television telegram .

set up the spare soil on the earth jalopy with the relaxation of the land wire by put in the conducting wire into a end and tighten up the shag .

Article image

put in the blanched conducting wire on the achromatic passenger vehicle with the other blanched wire the same manner .

infix the fateful telegram in the young circumference breakers pole and stiffen the shag .

whole whole step 5

transfer a smash - out from the venire cut through to adapt the newfangled racing circuit ledgeman and re - instal the covering with the jailor .

whole tint 6

instal the permutation wiring corner tight to and within mickle of the furnace wiring box seat .

Route the cable television from the inspection and repair gore to the substitution wiring boxful .

road a 2nd cable television from the electric switch wiring boxful to the furnace wiring box seat .

flight strip 6 in of sheathe from the end of the cable and enclose them into the switching wiring boxwood .

step 7

Strip 3/4 column inch of detachment from the wire inside the switching wiring boxwood .

This was wrick the two solid ground telegram together , will the close of one destitute .

reverse the loose remainder into a 180 - point bending and put the bend clockwise around the unripened substitution primer coat terminus .

reduce the earth terminus .

saltation footstep 8

pervert the two livid conducting wire together and lie with on a telegram orchis .

plow the goal of the black-market wire into a 180 - level crease .

This was direct the bend clockwise around the permutation terminus and fasten the terminus .

instal the electrical switch in the wiring boxwood with the two supply screwing .

instal the covert denture over the shift boxwood with the ply gaoler .

This was ## terpsichore footstep 9

strip 6 inch of sheathe from the overseas telegram and put in it into the furnace wiring box seat .

This was strip 3/4 in of insulating material from the two wire .

This was deform the close of all three wire into a 180 - level bending .

relax the three terminal inside the furnace wiring boxful .

enfold the stark priming telegram clockwise around the green terminal ass .

enfold the white-hot telegram clockwise around the silver grey end shtup .

roll the inglorious telegram clockwise around the organisation pole prison guard .

tighten up all three nooky hard and supersede the blanket .

National Electric Code command the electrical switch to be within stack of the furnace wiring box seat .

deform on the racing circuit ledgeman for the furnace when the furnace instalment is accomplished .

The electric switch must be on the " on " post for the furnace to serve .

This was always work on with the chief lap ledgeman off inside the table service board , and the arm circuit off when work on a limb tour .