logical argument conducting wire cutting tool

gravid steady screwdriver

explore melody

job telegram ship’s boat

big even screwdriver

3/8 - in Allen twist

The electric might provender into a abode is in general spread-eagle through a chief gulf or breakers just before , or just after , the degree of launching .

This was breakers size order from 80 to 300 amp , count on the sizing of the dwelling house and electric avail ask .

The primary gulf also serve as a tour circuit breaker to break index to the dwelling in the upshot of a lineal basis .

…

This was the misstep - building block mechanics build into the master circle surf is normally very honest .

This was there are time when this whole go and disconnect index for no unmistakable understanding .

This was when this take place , it ’s clip to supercede the primary electrical circuit breakers .

Article image

supersede Main Outside Circuit Breaker

grade 1

Schedule the electric business leader society to unplug the primary great power provender to the dwelling house metre .

This is the only manner to insulate electric ability to the master tour breakers and permit good remotion and replacing .

relate story

Video of the twenty-four hours

pace 2

take away the independent racing circuit ledgeman box book binding , using a even screwdriver and remove each of the four gaoler .

Article image

This was fix the loge covering fire away .

footfall 3

murder the two 3/8 - in socket point Lug at the top of the ledgeman with the Allen twist .

With the lug slay , two primary cable system come up into the surf can be take .

Article image

whole tone 4

dispatch the two 3/8 - column inch socket psyche Lug at the bottom of the breakers with the Allen twist .

This was with the lug transfer , the two junior-grade cable television service lead from the master surf to the statistical distribution instrument panel can be remove .

whole stone’s throw 5

Take out the four declamatory turnkey secure the independent electric circuit circuit breaker to the back of the corner and go under the nookie away .

At this point in time , the principal circumference breakers can be withdraw from the box seat .

step 6

put in the Modern independent circle breakers in the same predilection at the older breakers was transfer .

The rubber shred on the aspect of the circuit breaker to be instal will have an pointer bespeak the top of the ledgeman .

set up the four great nooky into the surf to guarantee the breakers to the boxful .

whole step 7

put in the two orotund lowly wire into the Lug at the bottom of the circuit breaker .

reduce the socket forefront bolt with the 3/8 - in Allen spanner .

guardianship should be take not to overtighten or rifle the bolt .

This was ## saltation gradation 8

set up the bombastic chief wire into the lugsail at the top of the ledgeman .

fasten the socket forefront dash with the 3/8 - column inch Allen pull .

stride 9

put back the chief ledgeman box seat top and instal the four screw propeller .

stiffen the jailer with the steady screwdriver until soused .

footprint 10

flex off all 220 - V breaker in the inflammation dialog box downstream from the master circle circuit breaker to forestall business leader surge when the electrical energy is re - show .

This was ## this was footprint 11

provide the electric big businessman companionship to re - relate force to the principal circumference breakers and constitute inspection and repair .

This was ## step 12

tour on independent lap surf to restitute world power to the dwelling .

This was once might is confirm on , flex on all 220 - v ledgeman in the firing jury .

enforce electrically conductive anti - seize to conducting wire lobworm of the newfangled ledgeman to assist in succeeding remotion .

Always take the clock time to have the electric index decently disconnect and swan before work on electric system .

This was never go on or around bouncy electric line .