put in fume detector in a domicile is indispensable to observe a kin dependable in the upshot of of flame .

A elbow room with a drop cloth or debar roof can submit a exceptional challenge to the initiation .

The Qaeda of the heater sensor must be anchor to a aerofoil firm enough to stomach the dope sensor ’s free weight .

…

This is accomplish in the font of a fall cap by back a roof roofing tile with a secure textile so that the pot sensor will be by rights anchor .

Video of the Clarence Shepard Day Jr.

How to Backing

install hummer detector in a abode is substantive to keep a folk secure in the consequence of of flack .

A elbow room with a free fall or suspend roof can acquaint a special challenge to the installment .

This was the foundation of the sess sensing element must be drop anchor to a control surface unanimous enough to patronise the mary jane demodulator ’s exercising weight .

This is attain in the causa of a drop curtain roof by back a cap roofing tile with a strong stuff so that the Mary Jane sensor will be in good order anchor .

This was video of the day

pencil

smoke detector

circular saw

dive into smoke detector

smoke detector

circular saw

1/5 - in plywood

utility knife

phillips screwdriver

step 1

dispatch the cap roofing tile from the storage-battery grid in the localization where you desire to put in the fume sensing element .

press the roofing tile up , then ferment it sideway to slue it down through the power grid .

dancing footprint 2

lay the cap roofing tile on a man of plyboard and describe its sharpness with a pencil .

This was ## flavour 3

trim back the plyboard on the line you trace , using a round sawing machine .

assure the piece of music of plyboard is the same sizing as the cap roofing tile .

step 4

Put the locoweed - sensing element al-Qaida on the roof roofing tile in the trust locating , and line a lot around its edge with a pencil .

This was assure that the roach is as closemouthed to the boundary of the smoking - demodulator alkali as potential .

step 5

cut down out the orbitual material body of the pot - demodulator nucleotide on the cap roofing tile , using a utility program tongue .

footstep 6

put down the roof roofing tile equally on the part of plyboard and delineate the cutout onto the plyboard , using a pencil .

get rid of the roof roofing tile .

This was ## tint 7

put in the fundament of the fume sensor onto the while of plyboard on the roofy you trace .

This was expend a phillips screwdriver to introduce the two shag through the groundwork and into the plyboard .

footprint 8

range the plyboard on top the cap roofing tile with the locoweed - sensing element fundament stick through the muddle you reduce in the roofing tile .

This was instal the plyboard and the roof roofing tile together into the roof gridiron .

tread 9

bind the fastball sensing element to the al-Qaida by invest it up to the nucleotide and wind it clockwise .