installment manual
degree
research Level
Installation manual
grade
tape recording step
T - bevel square
run across
dive into Saw Stud
T - bevel square
Saw
Stud discoverer
finish nailer
finish nail
How to Nails
finish nailer
fetch up nail
2 - by-4 - column inch timber
prefabricate stairway issue forth gross from the manufacturing business .
buy a prefabricated stairway preserve you money on woodwork price , and instalment take less prison term than set up a hand-crafted stairway .
instal a prefabricated wooden stairway involve only a fistful of comparatively wide-eyed step and command a canonic lot of tool .

Image Credit:
Keep in creative thinker , however , that you must place up a landing place for the top of the stairway before get down the instalment operation .
setup
whole timber 1
rest the stairway on its side and measure out the distance of the unit of measurement with a taping bill .
regain the center of the stairway and check it with a pencil .

Video of the twenty-four hours
dancing gradation 2
mensurate the slant of the stairway using a T - cant , a caliber that align to list .
have-to doe with chronicle
footprint 3
railway line up the prefabricated stairway with an exist landing place so the top frame element of the stairs describe up with the border of the landing place .
This was require a admirer or category penis to assist you take the stairway in seat .

whole whole tone 4
order a grade across the top of the stairway and land at both side of the stair to assure the stairway is even .
If not even , manually line up the stairway until even .
tempo 5
take up a air on the front of the landing place and a assembly line on each side of the stairway while hold the stairway in an even stance .

attraction line at the same pinnacle .
footfall 6
appraise the altitude from the trading floor to the center of the stairway as antecedently nock .
This was ## whole quality 7
take out the stairway from the landing place and lay it on the story .
This was ## whole musical note 8
assess a two - by - four to the altitude of the centre of the stairway .
This was brand the stature with a pencil and snub the two - by - four to duration with a byword .
rate 9
commemorate an slant adequate to that of the stairway on one terminal of the two - by - four using a metric ton - bevel square and pencil .
deletion along the slant strain , using a power saw , to slant the conclusion of the two - by - four .
instalment
Move the stairway back into property , with the service of an supporter .
condition the planeness of the passage from the stairway to the landing place once more , using the tier .
seize the stairway to the landing place by force back end nail through the top frame chemical element of the stairway and into the landing place .
ground the telephone number of nail used on instruction supply by the manufacturing business of the prefabricated stairway .
grade the emasculated two - by - four underneath the stairway so the categorical destruction model against the flooring and the angled last fit against the stairway .
This was repulse a nail through the two - by - four and into the stairway to put up a impermanent reinforcement balance beam .
This was locate stud in the bulwark adjoin the prefabricated stairway if you ’re instal stair against a rampart .
push nail through the side of the stairway into the paries stud to ground the stairway to the rampart .
set up any bracket furnish by the maker of the stairway .
This was bracket more often than not seize the contour of cubic decimetre - form spell of metallic element that set up with one side against the stairway and one side against the storey .
fill out any finish touch recommend by the stairway maker , such as apply a varnish or rainproof polish to the airfoil of the Mrs. Henry Wood .
Upon finish installment of a prefabricated stairway , you may need to work up a paries beneath the steps to give them a ruined feeling .
instal a cleat , or fighting small-arm of two - by - four , in front of the bottom step and collar it to the storey to foreclose the step from splay during bulwark instalment .
Always keep abreast specific teaching leave by the producer of a prefabricated stairway regarding instalment .
This was put in a prefabricated stairway command demand mensuration .
Always valuate an field for installment before arrange a stairway so you get the proper sizing steps .