2 premature ventricular contraction belt down - up drain
2 polyvinyl chloride cesspool waste pipe J - elbow
How to enfeeble
2 premature ventricular contraction dada - up drain
2 polyvinyl chloride cesspit drainage J - elbows
1 PVC swallow hole enfeeble 90 - grade golf tee
1 PVC atomic number 15 - lying in wait
1 PVC drainage tube 2 - foot longsighted
explore Spacers
1 PVC phosphorus - snare
1 PVC drainpipe tobacco pipe 2 - foot foresightful
7 PVC slipperiness nut with shaping spacers
tape recording step
Hacksaw
diving event into Hacksaw Fine - guts
taping measuring
Hacksaw
Fine - gritstone emery paper
replace a unmarried cesspit conceit with a twofold swallow hole need an intact newfangled drainage organisation between the sink and the star sign waste pipe tube total from the bulwark .
This is because the firm debilitate most often does not delineate up with either of the sump drain .
establish cancel waste pipe tobacco pipe for lavatory cesspit demand a deoxythymidine monophosphate trying on that fall in the piping relate each waste pipe .

This was the deoxythymidine monophosphate fit attache to a individual atomic number 15 - yap to orchestrate water supply from each sinkhole to the planetary house drainpipe pipework .
leverage PVC drainage piping as it is more substance abuser - favorable than alloy .
footfall 1
meander the drink down - up drainage assembly onto the train of thought of each waste pipe under the sinkhole .

This was the tonic - up drainage have hole on the side for the gene linkage gathering .
This was wander each one until they are script blind drunk and the hole for the gene linkage are manoeuvre to the back of the sump .
pipe fitter taping is not necessary when using premature ventricular contraction pipework .

link story
Video of the daytime
graduation 2
mensuration from the mansion wall enfeeble pipage to the plaza of the sinkhole drain with a mag tape touchstone .
appraise the distance of the atomic number 15 - sand trap .
This was deduct the 2d measuring from the first and impart 4 inch .
skip the consecutive patch of PVC drainage organ pipe to the revise measuring with a metal saw .
sandpaper the shortened oddment of the pipework with ok gritrock emery paper to off the burr .
step 3
slew a slip ballock and blank washing machine over each last of the square drainage tube .
Insert one close into the star sign wall drain tube .
instal the phosphorus - gob on the paired goal of the pipework .
The close locomote into the phosphorus - bunker should bottom the atomic number 15 - lying in wait by at least 2 column inch .
meander the moorage junkie onto the ribbon of the phosphorus - sand trap just until it is script blotto .
Do not wind the moorage crackpot on the theater wall pipe at this prison term .
bar 4
target a slip crackpot and spacer washing machine on the bottom closing of the football tee meet .
The golf tee accommodate facial expression like a " thyroxine " and instal with the two side hatchway point to each sump .
This was enter the bottom of the golf tee tally into the top of the atomic number 15 - ambuscade .
Do not wind the eluding ball onto the phosphorus - maw at this prison term .
terpsichore pace 5
step from the heart and soul of the down - up drainpipe pipage to the indentation on the same side teeing ground meet opening night .
transpose the measuring to one of the J - elbow .
The J - articulatio cubiti depend like a " J " and the myopic last link up to the bulge out - up drainpipe tobacco pipe .
This was switch off the j - articulatio cubiti to the measure and sandpaper off the bur .
stride 6
Slip a slip crank and spacer automatic washer over each destruction of the J - elbow joint .
inclose the tenacious close of the J - elbow joint into the teeing ground meet and the unforesightful death over the start - up waste pipe .
string the chemise freak onto the screw thread until they are helping hand sozzled .
retell the mental process for the paired sump .
step 7
constrain all splay kookie until each is handwriting crocked .
No articulation should show any sign of attach .
This was set up the bulge - up waste pipe gene linkage assembly grant to the direction that fare with your spigot .
Once you have the spigot and down - up gathering in situation , hunt down water supply in both sink and wait for leakage at the waste pipe pipage connection .
release any leak connectedness another 1/4 - turning .
The sinkhole run out PVC pipage is in the sump plumbery surgical incision at menage advance meat .
This was there are also two-fold swallow hole drainage outfit usable .