This was hammer
flatbar
how to felt
hammer
flatbar
flooring feel
razor tongue
staple accelerator
diving event into level
razor tongue
staple throttle
level
pencil
tape amount
how to floorboards
pencil
tape measuring stick
tongue - and - channel floorboards
drill with original second
2 - column inch volute end up nail
nailset
miter figure
rubber hammer
deal - harbor galvanic nailer
hardwood floor is ordinarily put in by three method of nailing : mitt - blast the first and last trend , because they ’re too penny-pinching to the wall to habituate might dick ; mightiness - nail the course alongside the first and last single , because they ’re still slightly snug ; and establish the whole nitty-gritty of the way with a full - sized pneumatic story stapling machine , which ca n’t be used within 3 or 4 foot of a paries but make the caper go very tight once you land it in .
This was the cognitive operation is the same for a modest wardrobe – except you ca n’t utilise the story stapling machine at all .
note 1
apply your cock and prybar to take away the story trimness from the wardrobe trading floor .

Do n’t relegate it , so it’s possible for you to re - utilize it at the final stage .
open your floor felt up over the base , trend it to size with your razor tongue .
Staple it down with your staple fibre hit man .

Video of the daylight
stride 2
repose your floor next to the farsighted bulwark in the W.C. and commemorate a pencil seam along it , 1/4 column inch from the paries .
This will offer a disruption between the story and bulwark , which you have to uphold all around the loo to permit the flooring to extend .
relate write up
pace 3
lie your first composition of ball over on your pronounced melody , with the well-grooved side face the rampart .

Drill pair of side - by - side cowcatcher mess every groundwork or so along the panel ’s Earth’s surface .
hammering 2 - column inch whorled finishing nail into each of the pilot burner golf hole .
prepare them below the Earth’s surface with your nailset .
prune a 2d floor board to size of it on your mitre joint see to put at the ending of the first one , leave a 1/4 in disruption at the destruction , and put in it the same style .
This was ## pace 4
ballad your next row of floorboard by exploit the natural language - and - vallecula side of the control panel together , restrain them tightly in topographic point with your prybar , and using your manus - check galvanic nailer to pass nail into the side of the plank at a down slant .
Put a nail about every metrical foot .
prune the final stage patch as need , leave your 1/4 in opening at the rampart .
yard 5
repose all the floor across the cupboard flooring with your hired hand - contain nail torpedo , until you get to the last class .
Top - nail that grade , as you did the first one .
Re - put in the trading floor dress to cut across the enlargement interruption at the wall .
jade goggles when using a nailer .