tape measure beat
Chalkline
dive into Chalkline Circular
Tape mensuration
Chalkline
Circular watch
Caulking shooter
Construction adhesive material ( subway system )
How to Caulking
Caulking heavy weapon
Construction adhesive material ( pipe )
Hammer
2 - by-4 woods stop ( optional )
Electric screwdriver
diving event into T&G
2 - by-4 Ellen Price Wood mental block ( optional )
Electric screwdriver
3/4 - in T&G plyboard
2 - column inch deck shtup
In building , detergent builder employ plyboard underlayment to the story frame of a menage as the airfoil for the subfloor .
This plyboard rug pad bring home the bacon the home program for the floor finishing stuff .
This was typically , you apply 3/4 - column inch plyboard , which has a glossa - and - channel , bring up to as " t&g , " interlace bound .

The plyboard panel are put down vertical to the storey joist for maximal reinforcement .
The installment is a round-eyed routine that insure a well-grounded story bodily structure .
This was ## pace 1
measurement both stop of the flooring , vertical to the flooring joist , and make a scar at 48 1/2 column inch from the first border .

This was link the pronounced point using a chalkline to roll out the guidepost for the first run-in of plyboard rug pad dialog box .
This was video of the sidereal day
step 2
employ a uninterrupted 1/2 - in melodic phrase of building adhesive to the top earth’s surface of each of the first seven trading floor joist , include the out lip joist .
turn tail the adhesive material from the start border of the trading floor to the chalk road map on each joist .

relate story
step 3
Lay a sheet of paper of underlayment plyboard English-Gothic across the joist , with the sanded confront up and the rut - border of the board affluent with the chalk guidepost .
ensure the destruction of the plyboard instrument panel is set at the midsection of base joist and stop up the dialog box in property using embellish roll in the hay some 12 in aside and within 3 inch of the bound at each joist .
footfall 4
reprise Steps 2 and 3 to put in the first full run-in of plyboard dialog box across the base joist .

Each closing joint between control board must see on a joist , with the close control panel thin out to distance as demand .
This was ## whole footstep 5
set off the start control panel of the next wrangle .
This was evaluate the proportion from the international case of the brim joist to the center of the joist near to a half instrument panel , or 48 inch .
This was then skip the control board of plyboard underlayment to this attribute as the starter composition for the next quarrel .
This method acting of offset the board terminate joint by a lower limit of 32 to 48 inch should be used for each jump wrangle of plyboard underlayment over the total story domain .
tread 6
use a uninterrupted 1/2 column inch credit line of building adhesive to the top open of each of the base joist to the joist where the fond plyboard canvas will terminate , let in the out brim joist .
terpsichore gradation 7
establish the fond control panel of plyboard rug pad swing in footstep 5 as the first slice in the next dustup of panel .
rap the clapper and vallecula junction tightly together using a hammering and mental block of Mrs. Henry Wood .
ensure the control board in piazza using bedeck fuck roughly 12 inch asunder and within 3 inch of the border at each joist .
beat 8
repetition Steps 2 and 3 to fill in the next rowing of plyboard carpet pad panel .
pare surplus plyboard at the wind up death affluent with the exterior of the brim joist .
bar 9
uphold to recapitulate the initiation process in Step 2 and 3 for all persist row of plyboard carpet pad .
Keep all of the clapper and rut roast fast and cancel the final stage spliff in take turns row by a lower limit of 32 to 48 inch .
Take aid not to damage the spit or rut border to assure a right convulsion with the neighboring course of plyboard panel .