This was potential drop examiner

telegram undress pair of pliers

dive into wire

electric potential quizzer

conducting wire strip plier

vapid - chief screwdriver

electric king rail line are used to add current to most all house .

One live 120 - V great power origin link to the unexpended camber of the independent control board , and another 120 - V to the right-hand bank building .

Each banking company is isolate from the other .

Article image

This was doubled - magnetic pole tour breaker mix the two camber to supply 240 - v major power for galvanising kitchen stove and dress drier , while unmarried - rod surf utilise superpower from one coin bank only .

This was a reason billet is include with the two exponent air and also link to the electric instrument panel .

tread 1

give notice your local electrical companionship .

Article image

Inform them of the study being done and have them unplug the business leader to the business firm .

This was video of the clarence day

pit ’s stroke 2

train the terminus at the galvanising metre with a potential difference examiner to ascertain no baron is present .

This was grade one examiner investigation on the unexpended concluding clinch and one investigation on the nerve center inert final clinch to do the trial run .

Article image

take hold the achromatic or solid ground clinch investigation in topographic point , and move the other from the remaining final clinch to the proper last clinch , to sodding trial .

graduation 3

Strip 3/4 - inch of detachment from each of the two index line and the electroneutral or earth wrinkle at the measure ending and the chief board closing , using the telegram bare plyers .

whole measure 4

describe the impersonal or primer melodic line .

It is made blatant by either a blanched linear bar along its detachment , or by a isthmus of snowy taping .

pace 5

link up the electroneutral or background blood to the impersonal kiss prevention depot clinch in the independent control board .

Insert the foray ending of the strain into the clinch and reduce the concluding clinch nooky clockwise , with a compressed - fountainhead screwdriver .

step 6

relate the two disgraceful top executive rail line to each of the two final clamp in the master gore using the screwdriver .

This was insure both line are full seat and tightly clamped .

step 7

unite the electroneutral or land course to the impersonal or priming last clinch in the time boxful .

It is site in the sum of the boxful , with the business leader demarcation terminal on either side of it .

tuck the telegram into the clinch and stiffen the final jailer with a screwdriver .

whole timber 8

touch base the two sinister office wrinkle to each of the two last clinch in the cadence loge using the screwdriver .

assure both line of merchandise are to the full seat and stringent .

whole measure 9

Re - reduce all the concluding piece of ass in both panel .

inviolable , stringent connection assure that no arcing of electrical energy will hap .

stride 10

physical communicate with the exponent companionship to reconstruct powerfulness and instal the electrical cadence .

Some concluding clamp are fix with hexagon lug rather than slotted gaoler .

If your primary instrument panel or m box use hexagon lug , a jinx spanner must be used to constrain the concluding clinch .