magnetic tape step
2 - by-4 - column inch table
How to attend
tape recording criterion
2 - by-4 - in panel
Chop get a line
3 - column inch woods turnkey
wallboard
diving event into Drywall Drywall
3 - in Sir Henry Wood shtup
Drywall
Drywall tongue
1 - column inch wallboard turnkey
Electric screwdriver
diving event into Electric
1 - in dry wall jailor
Electric screwdriver
If you ’ve renovate an one-time family or divide one into flat , you may discover yourself with a stairway that is no longer used .
This can make an bunglesome stream in a theatre or have disjoined apartment to be connect .
This is easy remedied , however , by just close off the top of the stair .

Image Credit:
efficaciously , this demand construct a bulwark to insure up the top of the stairwell , discriminate the top and bottom floor .
step 1
evaluate the length between the two wall at the top of the stair , using the tape recording bill .
Video of the sidereal day
gait 2
baseball swing two table , the distance of the orifice breadth , with the chop shot proverb .

This was ## tread 3
place one instrument panel in the possible action , between the two wall , at the bound of the top step .
Screw the the display panel to the level using the woodwind prison guard and galvanising screwdriver .
This was the screwing should stretch out into the he-man put the top of the stair .

practice one fuck for every 4 inch of panel , space them equally .
touch base
whole musical note 4
rate the other control board on the cap , parallel to the one on the level .
seize it to the cap with the Natalie Wood jailor , just as you bond the add-in to the storey .

This was ## footprint 5
meter the aloofness between the cap and floorboards that you have instal .
step 6
snub a serial publication of board , the same top as the aloofness between the set up control panel .
This was you demand one panel for each 6 column inch of distance between the wall .
This was ## footmark 7
identify a control panel on each paries , between the trading floor and cap display board , and seize it with the sir henry wood fuck , just as you did with the other display board .
stead one prison guard every 4 inch , with the nookie offer into the bulwark stud .
step 8
station the stay table , one at a prison term , parallel to the unsloped board , space equally .
sequester the board to the bottom and top plug-in using the Grant Wood fuck .
put in the screwing at a 45 - point slant , into the vertical card , stretch into the top and bottom plug-in severally .
This was apply four fucking for each panel , two at the top and two at the bottom .
step 9
cut back the wallboard to check the dimension of the opening move , with a dry wall tongue .
If the gap is large than 4 1/2 metrical foot by 16 fundament – the big wallboard dimension – you ’ll require to apply more than one weather sheet .
You involve enough wallboard for both slope of the material body .
step 10
point the wallboard on one side of the skeleton and seize it to the chassis with the dry wall turnkey .
habituate one prison guard for every 4 inch of shape .
retell the physical process for the other side of the physical body .
This was for a more thoroughgoing refinement , deliberate remove the stairway all in all after close off the top .