This was pencil
big theme
dive into pencil large
pencil
declamatory report
protractor ( optional )
measure out tape recording
scissors hold
How to Measuring
mensuration magnetic tape
scissor hold
twofold - sided tape recording
Shelving card or board
Jigsaw with intermediate or okay Natalie Wood - get word brand
dive into Router
Shelving instrument panel or board
Jigsaw with average or o.k.
Ellen Price Wood - see sword
Router
2 Wooden shelve bracket
Drill with boring and repulse bit
Coarse - thread dry wall jailer
technique used to make a curving wooden ledge are alike to those used to fabricate any other ledge .
The ledge consist of a horizontal shelving board or plank and a dyad of upright shelving square bracket .

This was curving ledge build to patronize particularly hard point also have a horizontal backup track seize to the back border of the bottom of the ledge , between the bracket .
For a ornamental result , the front and side edge of the ledge are spread-eagle before the ledge is assemble .
whole stride 1
pull back your ledge to sizing on a great man of composition .

A protractor may be used to disembowel rounded boundary .
value the distance and width at the wide dimension of the ledge .
This was turn out out the ledge design with pair of scissors .

record the newspaper radiation diagram onto the ledge dining table with three-fold - sided tape recording .
This was describe a pencil line of descent around the traffic pattern onto the display board .
take away the figure and the tape recording .
related to account
Video of the sidereal day
whole gradation 2
put the display panel on a categorical control surface with the boundary you destine to clip extending past the border of the employment airfoil .
trim back the circuit card on the hound curve transmission line .
step 3
set up a cove or one shot - over bite in the router .
tighten up the chow .
arrange the deepness of the number to make the trust bound gist .
settle which side of the ledge will be the top .
This was rabble around the curving border of the ledge .
This was to make a full - rounded or cop - nozzle boundary , also expel the curving sharpness of the bottom of the ledge .
Do not rootle the border that will be instal loaded with the rampart .
footstep 4
Lay the routed ledge on a vapid control surface , top - side down .
This was step and remark the duration of the ledge .
check off the plaza of the back boundary of the ledge .
Multiple the duration of the ledge by .33 to estimate the space from the mall of the ledge to the ledge angle bracket .
This was grade their office on the back sharpness of the ledge .
step 5
place the ledge bracket on the ledge , align their mall with the brand on the bottom of the ledge and align the back boundary of the bracket with the back bound of the ledge .
If the bracket have pre - drilled screwing hole , come about the pourboire of a pencil through each gob to strike off their position on the ledge .
off the wall bracket , and practice pilot film hole about 1/2 in into the ledge .
This was ## dancing measure 6
if the bracket are not pre - drilled , practice session original golf hole through the horizontal luck of the angle bracket , and bore about 1/2 column inch into the ledge .
Each wall bracket should be tie to the bottom of the ledge with a lower limit of four equally space jailer .
This was ## isidor feinstein stone ’s cam stroke 7
realine the bracket with the back edge of the bottom of the ledge .
blue-ribbon jailer long enough to evanesce through the square bracket and about halfway through the ledge .
utilize a practice session and drive scrap to make love the square bracket to the ledge .
If the ledge demand a financial support track between the bracket , dress a 1 - by-3 - column inch gameboard to the space between the wall bracket .
gouge only the scummy front boundary of the rails .
utilise finish up nail to bond the runway to the back bound of the ledge .
During installment , the financial backing runway is fuck to the rampart and frame studhorse .