Stud viewfinder

Pencil

dive into Stud

Stud view finder

Pencil

assess tape measure

Level

Wallboard see

dive into Level Wallboard

Level

Wallboard see

Straightedge

2 plank 1 - by-10 baseball bat , 16 in

2 board 1 - by-10 timber , 14 inch

search inch

2 board 1 - by-10 timber , 16 in

2 plank 1 - by-10 baseball bat , 14 inch

2 - column inch woodwind screw

Drill

1 canvass 1/2 - in plyboard , 16 by 16 inch

1 - column inch nail

Hammer

Paint

Paintbrush

Clamps

Wood putty

Most hoi polloi would shy forth from thin into their wall to tot up in a deep-set ledge .

If you go about it willy - nilly , then shy aside is a sound pick , but with the correct cognitive process it can be really elementary to adjourn a ledge in exist wallboard .

Because no lode - deliver social structure in the rampart is being alter , it ’s good for most do - it - yourself householder to instal a adjourn ledge themselves .

…

This was ## get the recess

step 1

find out two conterminous bulwark stud in the surface area you need to break up the ledge using a macho-man view finder .

The rivet will be 16 in aside .

Video of the solar day

step 2

Pencil the internal boundary of the wall stud stead in square perpendicular line that are 16 inch long – the altitude of your ledge – and parallel .

Article image

colligate the top and bottom of these crinkle with neat horizontal line , so the corner physique of the deep-set ledge is seeable on the bulwark .

related to story

Harlan Fisk Stone ’s cam stroke 3

obtain a dry wall project at 45 level to reduce out a belittled muddle in the centre of the ledge expanse .

The angled cut of meat will ascertain the cutout bit of drywall fall outwards , or else of into the rampart .

Article image

saltation dance step 4

bet through the maw to determine if there are any electric wire or plumbery to await out for while thin the ledge forge out from the dry wall .

whole tone 5

slew out the wallboard using the drywall byword .

This was utilize a straightedge place over the pencil line of the ledge cast to attain full-strength cut .

Article image

off the cutout venire of dry wall .

This was ## arrest the shelf insert

class two plank of 16 - column inch 1 - by-10 baseball bat and two plank of 14 - in 1 - by-10 baseball bat into a rectangle .

The remainder of the 14 - column inch piece should be position on the privileged sharpness of the 16 - in piece .

This was this will make in good order - angle corner .

This was predrill a buffer hollow every 2 column inch along the 10 - in edge of the 16 - column inch board into the abutting end of the 14 - column inch plank .

The pilot program hole should be size somewhat pocket-sized than the diam of a 2 - column inch ass .

This was plug the rectangle together with 2 - column inch screwing through the pilot light hole .

come in a sheet of paper of 16 - by-16 - column inch 1/2 - column inch plyboard over one undefendable side of the rectangle and assure it in home with 1 - column inch nail drive every 2 to 3 inch around the margin of the rectangle .

Paint the loge , which will be infix into the dry wall deferral to make the ledge .

permit to dry out as recommend by the pigment producer .

This was define up the ledge

crowd the ledge boxwood , back control board first , into the dry wall break and set the positioning so that the edge of the boxwood are moneyed with the dry wall , rather than with the border of the bulwark stud .

Drill four pilot burner hole size for 2 - column inch fuck through the side of the ledge loge into the paries stud .

The positioning should be one at the top and one at the bottom of each side of the ledge box seat and or so an in in from the side of each rampart stud .

This was this will depart count on if your paries stud are 2 - by-4 or 2 - by-6 baseball bat .

batten the ledge boxful to the rampart stud with 2 - column inch jailer tug through the original hole , then take over the top of the ass hole with forest putty and have wry .

extend to up the putty expanse with pigment to finish up the deep-set ledge .

If there is a flimsy col between the dry wall and the ledge boxwood , fulfil it with caulking and paint over it .