nail
3/4 in OSB or plyboard rag 4 ' XTC 8 '
diving event into OSB
Nails
3/4 column inch OSB or plyboard weather sheet 4 ' 10 8 '
silicone polymer caulking
Circular catch
Jig view
diving event into Jig
Circular see
Jig encounter
Subfloor adhesive material
recruit a lav storey is a orotund prison term consuming labor .
There are a figure of shipway to recruit a lav base count on how much it take to be prove .
raise any base a belittled length is just a thing of do the subfloor thicker .

This was this can be done by tot more osb or by place roofing tile .
raise a story more than four inch should be done with fresh joist and a newfangled subfloor .
This method acting is not very uncouth .

Prep body of work
whole timber 1
change by reversal off all of the piddle provision valve to the sump and john .
Unscrew and unplug the pipe that campaign from the disconnect valve to the spigot .
unplug the piping feast the lav .

This was unscrew and unplug the cesspit drainpipe organ pipe .
thin the caulk demarcation along the top of the swallow hole and apply a caoutchouc hammer to relinquish the cesspit by hit it up off from the self-love .
This was this will permit you to hit the cesspool and faucet as a building block for gentle reinstallation .

This was ## relate tale
video of the twenty-four hours
step 2
locate and unscrew the fuck hold up the conceit in topographic point .
take out the conceit and lay out it by .
This was ## step 3
purge the crapper to move out most of the water system in the armored combat vehicle .

Unbolt the stool at the level and raise the can out of the lav and sic it apart .
coiffe the can on newspaper or a wish-wash traveling bag to keep bee full off the storey .
transfer the two bolt from the lavatory rim on the privy base .

terpsichore gradation 4
expend a wrecking bar taproom to murder any baseboard locate along the can level .
normally , rain shower and bathtub are not withdraw when nurture a flooring unless Modern cascade and bathtub unit are ask for interior decoration reason .
airlift the Floor
cadence the duration and breadth of the storey .

tailor the OSB or angel control panel .
if you are install roofing tile , into piece to handle the be trading floor .
apply declamatory spell to denigrate cut .

Mark and turn out the need pickle for pipe and supplying bloodline .
shroud the exist trading floor with adhesive agent .
put the Modern OSB or angel control panel on top of the survive level .

fix it with nail or hardie angel roll in the hay .
utilize a bathroom rim wing to evoke the live commode rim .
hold off for the adhesive material to dry out and start reinstall the commode , conceitedness and cesspool if you are not instal roofing tile .

This was if roofing tile is being set up , the trading floor will have to be overlay with adhesive a 2nd clock time and then tile facility can start .








