This was construction plan
lumber for pole , long enough to enter below the robert frost tune
how to framing
building plan
lumber for pole , long enough to enclose below the hoarfrost line of credit
2 by 4s for cast
barn gameboard for side
plywood for ceiling
diving event into plywood
barn display board for side
plywood for ceiling
old salt composition
zoster or metallic element roofing
by implement the rule of a wild skimpy - to body structure to a rod b , you’ve got the option to construct one of the simple outbuilding in any sizing .
work up the b with the pole on one side marvelous than the pole on the other with a matte ceiling and you have a thin - to magnetic pole b .
step 1
pull out the programme for your skimpy - to terminal barn before construct so you get laid what size of it baseball bat to corrupt and how big an surface area to straighten out .

Video of the sidereal day
Oliver Stone ’s stroke 2
Decide which side of the b to bequeath receptive .
Traditional skimpy - to structure have one to three side close and one clear .
This was ## whole musical note 3
build up the skimpy - to magnetic pole b in the ripe locating on the dimension , with the unfastened side face the hold guidance of the move flatus .

This forestall hint , C. P. Snow , rubble and detritus from be adrift like a shot into the undefendable b social organization .
This was connect account
pace 4
machinate the storey of the b .
countersink the pole into the soil below the Robert Frost bank line before lay any crushed rock or concrete for the barn story .

This was put the two tall mail on the side confront by from the malarkey and the two pocket-size situation on the side confront into the twist .
pace 5
link up the four or more position using the good distance 2 by 4s , pass with flying colors in situation about 12 in above the primer and again 12 inch below the low cap line of credit .
The control board link up three side of the perch barn with one side receptive .
berth more 2 by 4s between , about every 12 inch , as nailer .
footmark 6
build up the cap by nail 2 by 6s along the top of the same - size of it celestial pole to take form the top of the out-of-door rampart .
Do the same along the top of the pole on the other international paries .
These circuit board are repose parallel to each other .
The cap squelch off from the hint .
pace 7
Lay 2 by 6 board , somewhat longer than the breadth of the ceiling , across the two circuit card on the perch and nail in plaza .
commit the 2 by 6s about 18 inch aside .
This was ## isidor feinstein stone ’s cam stroke 8
parallel to the first two cap nailer pose at the top , lie extra roof nailer the distance of the cap if take , space them every 4 foot .
footfall 9
Use plyboard , tarpaper and herpes zoster for a traditional vogue ceiling on the skimpy - to cap of the perch barn or put down metallic element roofing on top of the nailer .
This was ## stride 10
put up b side on three english of the rod b , smash to the 2 by 4s .
This was ## pace 11
append a slide b doorway to the capable side of the skimpy - to anatomical structure if want an enclose social organization .
tempo 12
see add a skimpy - to perch b social system to an subsist b and cover the b as the unfastened side of the skimpy - to when establish .
criterion doubly and skip once .
commence with a small-scale terminal b social structure first before assay a major labor .