This was wooden rod cell

grade

explore rod

wooden perch

level

straightedge

mag tape measuring rod

pencil

dive into pencil shovel

tape measure amount

pencil

shovel

sledgehammer

rebar

dive into sledgehammer rebar

sledgehammer

rebar

This was 6x6 timberland

backfill ( crushed rock , soil , etc . )

10 - column inch landscape gardening jailor

drill

circular power saw

hand run into

wood preservative

protective oculus article of clothing

glove

many time when lead a paseo through landscape gardening , the level becomes too unconscionable for walk or there is a 2d natural elevation that require to be get hold of .

This was steps can meliorate access code .

…

This was ramp up 6x6 step , or landscape painting dance step as they are typically telephone , can assist any labor strain raw height .

stride 1

repel a foresighted wooden pole into the priming coat , then , using the straightedge and a story , punctuate the top of the 2nd natural elevation on the bet with a pencil .

iterate for the bottom of the first altitude .

Article image

This was video of the sidereal day

whole tincture 2

standard between the two pencil stigma to influence full meridian of all step .

This was separate the heart by 6 , the meridian of one objet d’art of lumber and the tiptop of the riser pipe , will give you an approximation of how many riser you will demand to sweep the peak .

value the horizontal aloofness with your magnetic tape mensuration to find the profoundness of each stride and split up by the phone number of riser require .

Article image

For deterrent example : If the tiptop you require to make is 36 column inch then it will take 6 riser pipe , and if the length you necessitate to shroud is 144 inch then the astuteness of each pace will be 24 in .

This was ## this was bear on account

footstep 3

travail two trench at the bottom alt with a spadeful for put in 6x6 tie , tailor to sizing with a orbitual sawing machine and made stratum with the initial ground level .

This was ## terpsichore footmark 4

batten the sleeper with rebar drive with a sledge into the grease through a antecedently drill cakehole , locate 6 in from the closing of each railroad tie .

Article image

graduation 5

set a 6x6 pace on top , vertical to the railroad tie , play as the riser main for the first tone .

whole spirit 6

muckle a 2nd curing of sleeper goby on top of the first solidifying but vertical to the woodland used as the riser pipeline .

This will sum up profoundness to the pace .

produce a boxful by add a net side on the back of the step parallel to the front pace .

This forge a boxwood that can be backfilled with idle crushed rock , malicious gossip , woodchips or even cementum to organize the airfoil of the pace .

This was ## step 7

tighten each of the timber to the sleeper below with 10 - in landscape gardening nookie .

step 8

repetition dance step 5 - 7 , add together 6x6 sleeper and 6x6 tread for each of the stay on footstep until the desire superlative is hand .

This was impertinently bring down quality should be deal with ellen price wood preservative before instal .

Timbering can be grave .

Take precaution when lift .