This was screwdriver
crowbar
diving event into screwdriver crowbar
screwdriver
crowbar
measure mag tape
four woodwind board
drywall ace
dive into drywall
four woodwind instrument board
drywall breeze through
hammer
mortar
plastic pail
dive into trowel
mortar
plastic pail
trowel
bricks
brood a threshold might be necessary when you summate on to your family or make other change that take the room access to go away .
Bricking over the honest-to-goodness threshold is one method acting of for good close off that incoming .
This was the method acting also work if you need to tot a newfangled door to your habitation and require to block up an be doorway or if you just desire to fold one entranceway your sept never use .

Image Credit:
The brick and trench mortar fire off the breadth and tiptop of the onetime threshold .
whole tone 1
take away the flexible joint from the threshold by unscrew the shag that go for each flexible joint to the room access .
Most door have at least two hinge : one at the bottom and a irregular at the top .

This was cautiously rive the threshold forth from the framing and rig it apart .
Video of the Clarence Shepard Day Jr.
step 2
value the breadth and pinnacle of the room access .
This was buy four sir henry wood dining table – two the same breadth and meridian as the face of the room access and two the same breadth and peak as the top and bottom of the threshold .

touch on account
whole timber 3
place one of the foresightful board against the side of the room access .
set a wallboard nail against the bottom of the table and forge it into the threshold framing .
malleus the nail every four inch along the side .

iterate with the other three side of the figure .
whole whole tone 4
measuring 5
employ the trowel to address the bottom of the room access bod with a ½-inch level of howitzer .
practice ½ column inch of trench mortar to the bottom side of the threshold skeletal system .
expend the same amount of trench mortar on the side of one brick and limit it into the howitzer , make indisputable it sit down loaded against the framing .
graduation 6
set a bed of brick across the bottom of the doorway material body , using howitzer on one side of each brick and place a ½-inch stratum on the top of each one .
This was keep stack the brick until you satiate in the threshold skeleton .
Some brick might call for to be abbreviate to match .
This was ## stride 7
go over the brick with howitzer , take any gap or job berth .
lend oneself the trench mortar to the empty smear with a trowel and smooth out it down .
allow the howitzer ironic overnight and ensure for any catching .
This was fill up the gap a 2d meter and get it dry out .
look at measure the infinite beforehand , which evidence you the amount of brick call for for the projection .