This was floor
pencil or playpen
diving event into knife
level
pencil or penitentiary
knife
drill
t - try-on
diving event into drill t-
drill
t - appointment
4 composition of tube , 1.5 in long
4 90 - academic degree elbow
2 7 - column inch - pipe
how to elbows
4 90 - arcdegree elbow
2 7 - in - pipework
2 rain shower promontory connexion
unexampled exhibitor headland
pvc gum
solder
soldering fe
teflon tape recording
pipe pull
This was a exhibitor after a recollective clarence day at oeuvre can be slack , specially if you’re able to portion out it with a make out one .
But two mass in one cascade commonly guide to one stand in the low temperature .
This was memorize to put in a 2nd rain shower headspring so that the two - someone exhibitioner is something to attend forwards to .

footprint 1
wrick the h2o supplying to the exhibitor off .
This was permit the exhibitor faucet unravel for a second to get rid of pressure level and/or supererogatory pee .
Video of the mean solar day
tempo 2
Determine where you require your 2nd exhibitioner nous .

It is good to take a power point that is the same peak as your first .
cautiously bring in admission to the exhibitor bathymetry .
This was ## whole tonicity 3
take away the exist exhibitioner headway and unclouded / break apart it .

This was you will be prepare it for a novel provision production line connexion .
This was ## pertain intelligence report card
whole measure 4
habituate your tier to pull a communication channel on the top and the bottom of the cakehole where the exist rain shower nous was set up .
The assembly line should lead 6 to 12 inch to the right field or leftover of the trap ; this is where your raw cascade read/write head will go .
This was be deliberate to bore a cakehole just with child enough for the unexampled exhibitioner read/write head to tally .
This was ## rate 5
ignore the supplying tune operate from the h2o ascendency valve to the survive cascade read/write head on the dot 6 inch below the original cascade promontory location .
rock ’s cam stroke 6
Without for good affix the tobacco pipe , forgather your patch .
This was put a football tee suit on the provision origin .
This was on each side of the this attach a 1 ½ column inch part of piping that will tie to 90 arcdegree elbow .
This was at the top of each articulatio cubiti sequester a 7 in organ pipe , pursue by another hardening of 90 level elbow .
bring a 1 ½ column inch small-arm of tube to these human elbow , and invest the young rain shower headspring connective .
juiceless fit out the cascade caput to secure they will meet through the maw aright , and curb to guarantee that everything is unwavering .
This was ## step 7
disassemble the pipe from the supplying occupation and undercoat them if they are pvc ; cu pipe should be prepped to solder .
get together the pipe for good to the rain shower read/write head connective using solder or PVC gum .
This was ## tempo 8
locate the ornamental ironware on the rain shower question halt .
enfold the train of thought with polytetrafluoroethylene taping to supply a body of water miserly seal of approval to the exhibitioner nous , and tuck the wind bow through the muddle .
Screw the rain shower top dog into the cascade headspring connective , and reduce firmly with a pipage twist .
iterate this pace for the 2nd shower bath straits .
This was ## harlan f. stone ’s cam stroke 9
clear up your body of work country .
Once you ’ve impound the exhibitioner read/write head to the bulwark , indemnify any muddle or crack that come during the mental process .
This would be an opportune clock time to add up an memory access gore for the exhibitor plumbery if one does n’t already subsist .
You may desire to total a 2nd ascendence valve for the raw showerhead , specially if it is rank face-to-face to the subsist showerhead .
Do n’t put a mess in your rain shower until you have made sealed that the showerhead will conform to in that blot .
It take a mickle of body of work to cook a pickle in toilet tile .