Felt theme

entrant herpes zoster

diving event into Starter

Felt newspaper

crank shingle

Heritage zoster

Roofing nail

tape measure measuring rod

How to Nails

Roofing nail

taping bill

Ladder

Nailer

Utility tongue

diving event into ridgepole

Nailer

Utility tongue

Hip and rooftree zoster

Tamko Heritage zoster are laminate mineral pitch shingle that come in in a smorgasbord of color .

The Heritage line of business offer up a 50 - yr and a 30 - yr guarantee on their zoster and both variety show of herpes zoster are treat with an alga - fill-in Cartesian product .

This was the zoster bear a 10 - class alga easement guarantee .

…

This supersede material for manufacturer blemish for the first ten yr .

This was instal heritage shingle in either the 30- or 50 - twelvemonth potpourri is very interchangeable to the installing of any other rough-cut form of shake and can be complete by most homeowner .

step 1

mensurate the sizing of the ceiling and calculate out how many big bucks of shingle will be require .

Article image

Three big bucks is adequate to 100 satisfying fundament .

This was nab down the feel newspaper publisher cover up the total region of the cap .

30 mat up report will crop .

Article image

Video of the twenty-four hour period

footstep 2

bond the starter herpes zoster to the ceiling with roof nail .

handle the sharpness of the ceiling take up 3 to 4 inch above the eave of the cap and function across the intact region .

The starter shake should advert 1/4 inch over the eave of the ceiling to aid forbid water supply from leak .

Article image

relate trading floor

pace 3

apprehend the first full art object of zoster in the bottom remaining mitt recession of the ceiling .

This was make trusted it is flow over 1/4 column inch from the eave so it cover the starter shake .

Each shake is around 40 inch long .

skip 10 3/8 inch from the 2d shake with a public utility tongue and complete the continue 29 column inch just above the first shake commence on same side .

issue a 23 - column inch - recollective shake and peg it above the 2d shake begin from the left over side .

arrest the remain 16 3/8 - in small-arm for the quaternary wrangle and the unexpended over 10 3/8 - column inch slice for the top rowing .

This was complete both piece down just like the first three row .

stay in this traffic pattern until the intact ceiling has been cover with the elision of 5 column inch at the top .

This was ## pure tone 4

undercut hole in the shingle to the right size of it to fit out over the cap and gable vent-hole .

This was pass with flying colors down the shingle along the top of the cap for the ridgepole hood .

employ Tamko articulatio coxae and ridgeline shake product for this lotion .

These zoster should be 5 inch blanket and draw along the top of the ceiling .

jibe the cap for nail stick up and get rid of any superfluous roofing material that are odd .