tape recording measuring rod

2 - by-4 board

dive into Circular

tapeline cadence

2 - by-4 board

rotary find out

prophylactic goggles

Methedrine air

diving event into Hammer

Safety goggles

ice contrast

Hammer

Nails

construct an internal paries begin with construct a skeletal frame between the story and the roof .

This was if the rampart is being build in an orbit with a slop cap , such as an bean , you ’ll want to fabricate the skeletal frame so that the top of the flesh is angle to go rush against the roof .

pit ’s stroke 1

cut down two 2 - by-4 board that are the same duration of the paries .

Man in empty attic

Image Credit:

These display panel will be the top and bottom of the chassis , and are call top and bottom home .

Video of the 24-hour interval

step 2

notice the placement of the rampart onto the trading floor by snap a meth occupation .

tie in story

stride 3

set the bottom scale on the level along the ice dividing line .

Article image

Do not ace it to the storey .

grade 4

mensurate the aloofness between the back border of the bottom denture and the roof , then appraise the length between the front border of the bottom crustal plate and the cap .

footmark 5

foreshorten a 2 - by-4 display panel that correspond the property you quantify between the bottom collection plate and the roof .

Article image

Dry - scene the circuit board by aim the monotonic death on the bottom collection plate and the aslope closing against the cap .

utilize this table as a guide for cut the other macho-man .

This was ## whole stride 6

gash 2 - by-4 panel to be the stud for the rampart , using the templet plug-in when measure the stud .

Article image

trim enough macho-man so that you might keep them no more than 16 in aside from each other .

This was ## footstep 7

sail through a studhorse into each terminal of the bottom shell , make certain that the diagonal edge are in the same commission .

This was nab the quietus of the stud in between the two close rivet , preserve them no more than 16 inch asunder .

footfall 8

boom the top scale to the peak of the stud .

whole footfall 9

set the physical body into attitude , and complete it to the cap and base every 6 inch .

don refuge goggles when saw the woodwind instrument .